Photo Gallery

Thursday, September 22, 2016
Apparatus Refurbishment Work Detail - Utility #80-14

Gallery

Drilling for rail posts installations.

Views: 109

Cutting of side rails and posts

Views: 105

Side rail post installations

Views: 101

Views: 100

Views: 111

Cutting of excess bolts

Views: 122

Rear stepping to be manufactured

Views: 125

New electrical circuit board

Views: 119

Side railing installation

Views: 116

Views: 114

Views: 111

Views: 104

Views: 106

Views: 106

Views: 108

Installation of canpy bows

Views: 100

Views: 96

Views: 99

Views: 108

Sample illustration of rear canopy and markings. Canopy color will be tan.

Views: 106

Sample illustrations of rear canopy and markings. Canopy color will be tan.

Views: 109

Illustration of graphics for Utility #80-14

Views: 110



Story

Thursday September, 22 2016

Nature: Utility #80-14 Truck Refurbishment Activities

 

 

On Thursday evening, September 22, 2016, some volunteers of the Indian River Volunteer Fire Company attended a scheduled work detail to coordinate the truck refurbishment activities associated with Utility #80-14 which is a surplus military 5-ton repurposed for inclement weather within the fire district.

 

This work detail highlighted the electrical system re-wirings, establishment of a circuit board, materials and installation interior compartment lightings, and materials preparation and installation of the rear compartment side railed and canopy bows.

 

The raw materials were measured, cut, drilled, and installed while on location.  Much of the electrical system re-wiring has been completed with the lighting packages pending installation or delivery.  The new tarps and canopy will be special ordered and configured within the immediate foreseeable future.

 

Additional information regarding this unit can be identified by viewing the attached links:
 

http://www.irvfc.com/apparatus/detail/22937

 

http://www.irvfc.com/gallery/detail/18494?ss=1

 

http://www.irvfc.com/gallery/detail/18591